Case studies
Environment
Tarmac UK
Tarmac UK
April 9, 2023
Biodiversity Case Study
Launch of Tarmac’s Biodiversity Action Plan for sites in Northumberland
Objective
Launch of Tarmac’s Biodiversity Action Plan for sites in Northumberland.
Context
Biodiversity Action Plans are an integral part of protecting and restoring biodiversity. Tarmac la...
Read more
Environment
Various companies in UK
Various companies in UK
April 9, 2023
Biodiversity Case Study
Launch of the www.afterminerals.com website.
Objective
To understand the potential contribution of mineral sites in England to UK Biodiversity Action Plan targets for habitat creation.
Context
Mineral sites are often ideal for creating...
Read more
Environment
Aarekies
Aarekies
April 9, 2023
UEPG Sustainable Development Awards 2013
Identification, documentation and promotion of biodiversity in the Däniken/Dulliken gravel extraction site
Objective
Identification, documentation and promotion of biodiversity in the Däniken/Dulliken gravel extraction site.
Context
The gravel extraction site in Däniken/Dulliken, operated by Aar...
Read more
Environment
Bersier SA
Bersier SA
April 9, 2023
Biodiversity Case Study
To create a gravel pit learning center
Objective
To promote the image of the sand and gravel extraction industry towards the population.
Context
The sand and gravel extraction site is characterized by areas of recent and spreading...
Read more
Environment
Grob Kies AG
Grob Kies AG
April 9, 2023
Biodiversity Case Study
To combine the needs of extraction sites with nature protection areas
Objective
To combine the needs of extraction sites with nature protection areas. To prove the positive impact of extracting activities on biodiversity.
Context
As early as 1970, the first aut...
Read more
Environment
Grob Kies AG
Grob Kies AG
April 9, 2023
Biodiversity Case Study
Monitoring certifying restored sites
Objective
In defined areas selected numbers of species were monitored, during a period of 6 years (2006-2011), to learn more about their qualitative and quantitative development.
The Swiss compa...
Read more
Environment
Kieswerk Kiemy AG
Kieswerk Kiemy AG
April 9, 2023
Biodiversity Case Study
To encourage the survival of the yellow-bellied toad
Objective
To encourage the survival of the yellow-bellied toad, a species under threat throughout the country, over the entire quarry area of the Kiemy gravel works in Düdingen. The same measures...
Read more
Environment
Schumacher Ziegelei
Schumacher Ziegelei
April 9, 2023
Biodiversity Case Study
Creation of a nationally important amphibian spawning ground
Objective
The site of the Schumacher brickworks is a nationally important amphibian spawning ground. Yellow-bellied toads, midwife toads, natterjack toads and grass snakes are the species which are...
Read more
Environment
Sigrist Kies GmbH
Sigrist Kies GmbH
April 9, 2023
Biodiversity Case Study
Creation of a natural area with a wide variety of species and great ecological value
Objective
Sigrist Kies GmbH is a family business with a small gravel extraction site. The extraction site which has already been depleted and brought back into cultivation is being used extensively...
Read more
Environment
Arenas Silíceas S.A. & Sibelco Minerales S.A.
Arenas Silíceas S.A. & Sibelco Minerales S.A.
April 9, 2023
Biodiversity Case Study
Implementation of an Environmental Management System certified under ISO-14001.
Objective
The active participation in protecting the environment, the conservation of mining resources and the efficiency of its use.
To implement an Environmental Management System certified un...
Read more
Environment
Áridos y Premezclados S.A.
Áridos y Premezclados S.A.
April 9, 2023
Biodiversity Case Study
Creation of an ecosystem rich in animal and vegetal species, turning it into one of the most important Reserve of endangered birds in the Community of Madrid
Objective
The main objective was to develop an industrial process, respectful of the environment, which would create an ecosystem rich in animal and vegetal species, turning it into one of the most...
Read more
Environment
Áridos y Premezclados S.A. (ARIPRESA)
Áridos y Premezclados S.A. (ARIPRESA)
April 9, 2023
Biodiversity Case Study
Recovering the forest of the site area
Objective
One of the main aims of the company is the right development of the exploitation project and the fulfillment of preventive and corrective designed measures.
Context
The site is loca...
Read more
Environment
Canteras la Ponderosa
Canteras la Ponderosa
April 9, 2023
Biodiversity Case Study
To rehabilitate areas degraded by the extraction of aggregates, and improve the habitat of the flora and fauna of the area, including recovering ecosystems that have disappeared throughout h…
Objective
To rehabilitate areas degraded by the extraction of aggregates, and improve the habitat of the flora and fauna of the area, including recovering ecosystems that have disappeared throughou...
Read more
Environment
Cementos Lemona
Cementos Lemona
April 9, 2023
UEPG Sustainable Development Awards 2013
The main project objectives were the landscape integration of infrastructures, degraded soils recovery, undesirable views screening, soil erosion and control and the previous habitat recover…
Objective
The main project objectives were the landscape integration of infrastructures, degraded soils recovery, undesirable views screening, soil erosion and control and the previous habitat reco...
Read more
Environment
CEMEX Spain
CEMEX Spain
April 9, 2023
UEPG Sustainable Development Awards 2013
Developing a Biodiversity Action Plan (BAP) for the Soto Pajares Quarry in a Natura 2000 site
Objective
Developing a Biodiversity Action Plan (BAP) for the Soto Pajares Quarry in a Natura 2000 site.
Context
The CEMEX Soto Pajares gravel extraction site (in San Martín de la Vega, Madr...
Read more
Environment
Compañía General de Canteras S.A. - Italcementi Group
Compañía General de Canteras S.A. - Italcementi Group
April 9, 2023
Biodiversity Case Study
Specific restoration of the different areas in the 52 hectares of the site, to bring them back to the original environmental levels of the exploitation
Objective
The main objective of this restoration was to get a full regeneration of damaged lands, where nowadays it is hard to imagine the presence of a previous activity.
Context
The gravel...
Read more
Environment
Compañía General de Canteras S.A. - Italcementi Group
Compañía General de Canteras S.A. - Italcementi Group
April 9, 2023
Biodiversity Case Study
To reproduce the Mediterranean surrounding forest, looking for a maximized integration of the restored site
Objective
The basic aim was to reproduce the Mediterranean surrounding forest, looking for a maximized integration of the restored site.
Context
At the quarry “Los Arenales”, a very good...
Read more
Environment
Compañía General de Canteras S.A. - Italcementi Group
Compañía General de Canteras S.A. - Italcementi Group
April 9, 2023
Biodiversity Case Study
To reproduce the Mediterranean surrounding forest, looking for a maximized integration of the restored site
Objective
The restoration project carried out in 1990 had the purpose of revegetating some areas which were previous quarries and had not been restored yet.
Context
The exploitation is locate...
Read more
Environment
ERIMSA
ERIMSA
April 9, 2023
Biodiversity Case Study
The exploitation is designed to create and recover more lagoons, in such a way that it increases the floodplain of the ZEC Ladra-Támoga-Parga, favoring the settlement of new birds and ripar…
Objective
The exploitation is designed to create and recover more lagoons, in such a way that it increases the floodplain of the ZEC Ladra-Támoga-Parga, favoring the settlement of new birds and ri...
Read more
Environment
ERIMSA
ERIMSA
April 9, 2023
UEPG Sustainable Development Awards 2016
Protection and preservation of the SAC Ladra-Támoga-Parga
Objective
Protection and preservation of the SAC Ladra-Támoga-Parga.
Context
ERIMSA has been involved in extracting operations for over 30 years, applying environmentally friendly and suitab...
Read more
Environment
Hanson – Heidelberg Cement
Hanson – Heidelberg Cement
April 9, 2023
Biodiversity Case Study
Attempt to recover the original Jarama river wetlands areas which unfortunately almost disappeared in the region
Objective
The main objective of the comprehensive restoration performance carried out on the site, were to give back to the area the uses it had before the extraction, when its uses were mainly agr...
Read more
Environment
Hanson Hispania (HeidelbergCement Group)
Hanson Hispania (HeidelbergCement Group)
April 9, 2023
Biodiversity Case Study
A study has been made in applied research for the management of biodiversity in gravel extraction sites with permanent water ponds, both restored and in operation, to assess the compatibilit…
Objective
A study has been made in applied research for the management of biodiversity in gravel extraction sites with permanent water ponds, both restored and in operation, to assess the compatibi...
Read more
Environment
Holcim Spain
Holcim Spain
April 9, 2023
UEPG Sustainable Development Awards 2010
The gravel pit was designated a zone of special protection for birds (ZEPA)
The El Puente gravel pit, located in the Toledo province about 45 km from Madrid, is a unique open-pit mining site which serves as a remarkable example of sustainable growth and flourishing biodiversi...
Read more
Environment
Holcim Spain
Holcim Spain
April 9, 2023
Biodiversity Case Study
To recover the natural habitats for aquatic bird
Objective
The main objective is to recover the natural habitats for aquatic bird, mixing the treatment and the emptying of the existing land and the existing vegetation to cover the basic needs of...
Read more